Haier HCH2100ACS Bedienungsanleitung Seite 9

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 56
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 8
7
ELECTRICAL REQUIREMENTS
Observe all governing codes and ordinances.
Ensure that the electrical installation is adequate and in conformance with National
Electrical Code, ANSI/NFPA 70 (latest edition), or CSA Standards C22.1-94,
Canadian Electrical Code, Part 1 and C22.2 No. 0-M91 (latest edition) and all local
codes and ordinances.
If codes permit and a separate ground wire is used, it is recommended that a
qualied electrician determine that the ground path is adequate.
A copy of the above code standards can be obtained from:
National Fire Protection Association
1 Batterymarch Park
Quincy, MA 02169-7471
CSA International
8501 East Pleasant Valley Road
Cleveland, OH 44131-5575
It is important to make sure you have the proper electrical connection.
RECOMMENDED GROUNDING METHOD
A 120 volt, 60 Hz, AC only, 15-amp fused, grounded electrical supply is required. Use
an outlet that cannot be turned o by a switch. Do not use an extension cord.
NOTE: Before cleaning, or removing a light bulb, turn vent hood o, and then
disconnect the vent hood from the electrical source. When you are nished,
reconnect the vent hood to the electrical source.
INSTALLATION INSTRUCTIONS
PREPARE LOCATION
It is recommended that the vent system be installed before hood is installed.
Before making cutouts, make sure there is proper clearance within the ceiling or
wall for exhaust vent.
Check your ceiling height and the hood height maximum before you select your
hood.
1. Disconnect power.
2. Determine which venting method to use: roof, wall, or nonvented.
3. Select a at surface for assembling the range hood. Place covering over that
surface.
Seitenansicht 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 55 56

Kommentare zu diesen Handbüchern

Keine Kommentare